Crane lift plan example

broken image

Therefore, establishing criteria for “critical lifts,” preparing formal lift plans, understanding the factors that affect rated capacities of mobile cranes, ensuring equipment is in good condition, and ensuring only qualified and trained personnel operate the equipment are all important components in preventing mobile crane incidents.Īll crane lifts require some level of planning, whether the load is a mere half-ton or more than 2,000 tons. “People do not plan to fail, they fail to plan.” As a result, less-than-adequate crane lift planning encompasses most, if not all, of the above causal factor categories.

broken image